## Case Studies

### [Active Water Management drives efficiency and long-term impact at a semiconductor facility](/content/resources/case-studies/active-water-management-drives-efficiency-and-long-term-impact-at-a-semiconductor-facility/index.html)

Nov 1, 2025

### [Driving clarity & confidence in fab wastewater strategy with Active Water Management](/content/resources/case-studies/driving-clarity-confidence-in-fab-wastewater-strategy-with-active-water-management/index.html)

Nov 1, 2025

### [Speed and confidence in construction for a semiconductor megafab](/content/resources/case-studies/speed-and-confidence-in-construction-for-a-semiconductor-megafabbefore-avm-rural-site-and-new-chemistries-introduced-high-complexity-and-uncertainty-freshwater-limitations-posed-a-risk-to-startup-and/index.html)

Nov 1, 2025

### [Active Water Management helps semiconductor manufacturer chart a realistic path to a 60% enterprise reuse rate](/content/resources/case-studies/active-water-management-helps-semiconductor-manufacturer-chart-a-realistic-path-to-a-60-enterprise-reuse-rate/index.html)

Nov 1, 2025

### [Refinery achieves 80% water reuse with FTD’s Active Water Management](/content/resources/case-studies/refinery-achieves-80-water-reuse-with-ftds-active-water-management/index.html)

Nov 1, 2025

### [How a semiconductor facility kept a new factory on schedule with a digital water model](/content/resources/case-studies/how-a-semiconductor-facility-kept-a-new-factory-on-schedule-with-a-digital-water-model/index.html)

Nov 1, 2025
